Developer/Contractor/District:
1. Hold preconstruction meeting, following this agenda:
a. Construction Requirements
b. Bond Reductions
c. Schedule submitted and discussed
2. The Required attendees are:
a. Contractor
b. Inspector
c. Developer
3. The Optional Attendees are:
a. District Engineer
b. Design Engineer
c. Other