The Contractor/Developer:
1. Constructs sewer in accordance with design and specifications.
a. Ensures sewer service is installed to every lot
2. Requests inspections
3. Performs applicable/required testing and submits to District Inspector
a. Air Test Pipe
b. Leak Test
c. Compaction Test
d. Vacuum Test Manholes
e. Deflection Test
4. Submits
a. Certified Survey
b. Test results
c. Lateral Locations
5. Requests 80 % Security Release