• Project Background
    • In late 2017, construction of the sewer line and trail down Hog Hollow was completed;
    • The warranty was completed in the fall of 2018. Before the warranty expired, the District televised the sewer line and performed a last inspection of the work.  Everything was found in order and the District released the bond.
    • In the winter of 2019-2020 the District was approached by Draper City stating that the area originally disturbed by the sewer construction, around Hog Hollow had sluffed and was in need of repair.
  • Project Purpose and Scope
    • Repair sluffed areas
  • Project Status
    • The District designed the repair with consultation from AGEC.
    • The District put the project out to bid and Lydon Jones was the lowest responsive bidder.
    • Project is now under construction.