• Project Background
    • Two developers have contacted the District about developments at the Geneva Gravel Pit site, where there is currently no sewer available.
    • There is currently no sewer available in this quadrant.
  • Project Purpose and Scope
    • Extend the sewer to the two developments that can also accommodate the future developments at the Geneva Gravel Pit site.
  • Engineer: JUB Engineers
  • Project Status
    • The District is accepting bids for the project.
    • The estimated bid date for the project is March 9, 2023.
  • Project Background
    • The District has desired to abandon the West Outfall along the South Jordan Canal, including this area, for quite some time for safety concerns.
  • Project Purpose and Scope
    • Install a new sewer line and connect it to an existing sewer line.
    • Abandon the existing sewer line and manholes along the South Jordan Canal.
  • Engineer: Horrocks Engineering
  • Project Status
    • Horrocks Engineering is designing the project.
  • Project Background
    • The District has evaluated the condition of the three main outfall pipes from Camp Williams to 9000 South.
    • The pipes are reaching the end of their service life and need to be lined.
    • This project will be the third of a multi-year phased outfall lining project.
  • Project Purpose and Scope
    • Rehabilitate portions of the District’s three main outfall lines.
  • Engineer: Consor (PEC)
  • Project Status
    • The District is accepting prequalification for the project.
    • The estimated bid date for the project is February 9, 2023.
  • Project Background
    • The District’s flow model has shown, and it has been identified in the SECAP that the sewer line in 11800 is nearing capacity.
    • 11800 South has been approved as a Capital Improvement Project.
    • The District is coordinating with Riverton City, as the will be replacing a water line, and Herriman City and South Jordan City, as they may be widening 11800 South.
  • Project Purpose and Scope
    • Upsize approximately 19,750 feet of existing pipe to 30″ and 36″ to increase capacity.
  • Engineer: Bowen, Collins, and Associates
  • Project Status
    • Bowen, Collins, and Associates is designing the project.
    • AGEC will provide Geotech services.
    • The estimated bid date for the project is May 2023.
  • Project Background
    • The District’s flow model has shown, and it has been identified in the SECAP that the sewer line in 13400 is nearing capacity.
    • 13400 South has been approved as a Capital Improvement Project.
    • The District is coordinating with UDOT, as UDOT will be constructing an interchange at 13400 South and Bangerter Hwy.
  • Project Purpose and Scope
    • Upsize approximately 9,900 feet of existing pipe to 18″ to increase capacity.
  • Engineer: Hansen, Allen, & Luce
  • Project Status
    • Hansen, Allen, & Luce is designing the project.
    • AGEC will provide Geotech services.
  • Project Background
    • The District’s flow model has shown, and it has been identified in the SECAP that the sewer line in 14400 is nearing capacity.
    • 14400 South has been approved as a Capital Improvement Project.
    • The District is coordinating with Bluffdale City, as they will be replacing a water and storm drain line.
  • Project Purpose and Scope
    • Upsize approximately 7,520 feet of existing pipe to 18 to increase capacity.
  • Engineer: JUB Engineers
  • Project Status
    • JUB Engineers is designing the project.
    • GeoStrata will provide Geotech services.