• Project Background
    • Michael Fazio, Bluffdale City Engineer, contacted the District regarding a new capital project Bluffdale City has to restripe 14400 South and 1650 West.
    • The District has desired to abandon the west outfall along the South Jordan Canal, including this area, for quite some time for safety concerns.
  • Project Scope ,
    • .Install approximately 220 lf pipe and appurtenances
  • Project Purpose
    1. Abandon west outfall
  • Engineer – Bowen Collins and Associates
  • Project status:
    • The design is 100% complete and turned into city for bidding.
  • Project Background
    • The District has completed televising the three main outfall pipes from Camp Williams to SVWRF.
    • The pipes are reaching the end of their service life and need to be lined.
  • Project Purpose and Scope
    • Rehabilitate the three main District outfalls over the next 20 years.
  • Engineer: PEC
  • Project Status
    • PEC has submitted a report to the District regarding the status of the East and West Outfalls and River lines.
    • It is anticipated that the work north of 9000 South will be put out to bid by South Valley Water Reclamation Facility.
  • Project Background
    • The District’s pipes in 6000 west have a bottleneck where a 15-inch bottlenecks to a 10-inch pipe.
  • Project Purpose and Scope
    • Upsize 10 inch pipe to 15-inch pipe to relieve bottleneck.
  • Engineer:                                 PEC
  • Project Status
    • Design is underway by PEC and Herriman City